Awarded a contract supporting FLEETEX 250 at Marine Corps Base Camp Lejeune, Beachview provided and operated 17,646 square feet of billeting tents and 48 individual shower stalls, along with bulk water, lighting, power and wastewater services for approximately 700 personnel.

Mission overview

Base life support in the field.

FLEETEX 250 put roughly 700 personnel in the field for three weeks at Camp Lejeune. Beachview provided and operated 17,646 square feet of billeting tents and 48 individual shower stalls, with the bulk water, lighting and wastewater services that base life depends on.

The project's power infrastructure included a primary generator, backup generators and an automatic transfer switch to ensure continuous operations. The scope also covered deployed and operated potable-water and greywater trucks, 20,000 gallons of potable-water storage and 20,000 gallons of greywater storage.

Beachview provided comprehensive custodial services for all facilities and equipment. A dedicated on-site team managed daily operations, regulatory and safety compliance, preventive maintenance and service continuity for the full duration of the exercise.

Project details

Partners
Dept. of War · U.S. Marine Corps
Location
Marine Corps Base Camp Lejeune, North Carolina
Performance period
June 8 – June 30, 2026
Scope
Billeting, bulk water, lighting, showers and wastewater
Personnel supported
Approximately 700
Billeting and showers
17,646 sq ft of tents · 48 shower stalls
Capabilities

Services delivered.

Every scope below was delivered and operated by Beachview under one contract and one point of contact.

  • 17,646 sq ft of billeting tents, installed and operated
  • 48 individual shower stalls
  • Potable-water and greywater trucks, deployed and operated
  • 20,000 gallons of potable-water storage
  • 20,000 gallons of greywater storage
  • Primary and backup generators with automatic transfer switch
  • Temporary lighting across the exercise footprint
  • Custodial services, compliance and preventive maintenance
Impact

Outcomes on the record.

Measurable results from a mission delivered under time pressure and close scrutiny.

01

17,646 sq ft of billeting

Tents installed and operated to house the exercise force for three weeks.

02

700 personnel supported

Billeting, showers, water and wastewater for every service member on site.

03

Uninterrupted power

Primary generator, backups and an automatic transfer switch protecting continuity.

04

Full custodial coverage

A dedicated on-site team ran daily operations, safety compliance and maintenance.

Ready when you are

Planning a deployment with a hard date attached?

Tell us the headcount, the location and the timeline, and we will build the roadmap.